Last updated: February 25, 2026
Starting a daycare in Missouri is regulated by the Department of Elementary and Secondary Education (DESE), Office of Childhood. The good news: Missouri charges no application fee and no licensing fee for child care facilities – one of the few states where the license itself is free. Missouri offers three license types based on capacity: family child care home (up to 10 children), group child care home (11-20 children), and child care center (21+ children). The main upfront costs are background checks ($57 per person), training, and facility preparation. Missouri is also in the process of eliminating 177 licensing rules to reduce regulatory burden, with changes expected in late 2026 or early 2027.
Daycare Requirements in Missouri at a Glance
| Requirement | Agency | Cost | Timeline |
|---|---|---|---|
| Child Care License | DESE Office of Childhood | Free | Begin 30+ days before opening |
| FBI Fingerprint Background Check | MO State Highway Patrol / FBI | $41.75/person | 7-10 business days |
| Family Care Safety Registry | MO DHSS | $15.55/person (online) | Lifetime registration |
| Fire Safety Inspection | MO Division of Fire Safety | Free (state-funded) | Annual |
| Sanitation Inspection | Local health department | Free | Annual |
| CPR/First Aid Certification | AHA / Red Cross | $50-$100/person | Within 90 days of hire |
| Annual Training (12 hours) | DESE-approved providers | Varies | Each calendar year |
| LLC Formation | MO Secretary of State | $50 (online) | 3-5 business days |
| General Liability Insurance | Private Carrier | $1,500-$3,000/year | Before opening |
| Federal EIN | IRS | Free | Immediate (online) |
How to Start a Daycare in Missouri (Step by Step)
Step 1: Choose Your License Type
Missouri offers three child care license types through the DESE Office of Childhood:
| License Type | Capacity | Key Details |
|---|---|---|
| Family Child Care Home | Up to 10 children | 1 provider: max 6 children (max 3 under age 2). With assistant: up to 10 (max 4 under age 2), or up to 8 if all under age 2. |
| Group Child Care Home | 11-20 children | May be at a location other than the provider’s residence. |
| Child Care Center | 21+ children | Capacity tied to director education level. Requires more staffing and facility space. |
Center director qualifications affect capacity:
- Up to 20 children: CDA credential minimum
- Up to 60 children: 60 college credits (12 child-related)
- Up to 90 children: 90 college credits (18 child-related)
- 120+ children: 120 college credits (24 child-related) – essentially a bachelor’s degree
Details: DESE Director Qualifications
Step 2: Complete Background Checks
All child care workers must complete two background checks before having contact with children:
1. Family Care Safety Registry (FCSR):
- Register at health.mo.gov/safety/fcsr
- Fee: $15.55 (online, one-time lifetime registration)
- Screens against child abuse/neglect central registry, sex offender registry, and other databases
- Must be repeated annually (30 days before your anniversary date)
2. FBI Fingerprint Background Check:
- Submit fingerprints through the MACHS portal (Missouri Automated Criminal History Site)
- Fee: $41.75 per person
- Processing: 7-10 business days
- DESE reviews results and issues an eligible/ineligible determination
Total background check cost per staff member: approximately $57.
Details: DESE Background Check Process
Step 3: Get Training and Certifications
- CCDF Health & Safety Training: Must be completed within 90 days of hire and before having sole supervision of children
- CPR/First Aid: Current Pediatric First Aid and Infant/Child CPR certification required. Must include an in-person skills assessment ($50-$100 per person)
- Annual training: 12 clock hours of DESE-approved training per calendar year for all child care staff
- Professional Development Registry: All caregivers must obtain a Missouri Professional Development (MOPD) ID number for training tracking
Details: DESE Training Information
Step 4: Prepare Your Facility
Space requirements:
- Indoor: Minimum 35 square feet of usable floor space per child
- Outdoor: Minimum 75 square feet per child, free of hazards
Staff-to-child ratios (child care centers):
| Age Group | Staff:Child Ratio |
|---|---|
| Infants (6 weeks – 12 months) | 1:4 |
| Toddlers (13-24 months) | 1:8 |
| Two-year-olds | 1:8 |
| Three-year-olds | 1:10 |
| Four-year-olds | 1:10 |
| Five years and older | 1:16 |
Inspections before opening:
- Fire safety inspection: Annual, conducted by the Missouri Division of Fire Safety at no cost
- Sanitation inspection: Annual, conducted by local health department at no cost
- Compliance inspections: Licensed facilities are inspected twice per year by DESE
Step 5: Apply for Your License
Submit a license application to the DESE Office of Childhood. Missouri charges no application fee and no licensing fee – the license is completely free.
- Begin the process at least 30 days before your planned opening
- Pass all pre-opening inspections (fire, sanitation, compliance)
- All staff background checks must be cleared
- License is renewed annually by submitting an Annual Declaration form
Contact DESE Office of Childhood: (573) 751-4212 or visit dese.mo.gov/childhood/start-child-care-program
Step 6: Form Your Business Entity and Get Insurance
Register an LLC with the Missouri Secretary of State ($50 online, no annual report). Apply for a free federal EIN from the IRS.
General liability insurance is required for licensed child care facilities. Typical cost: $1,500-$3,000/year depending on capacity and coverage level.
Workers’ compensation is required if you have 5 or more employees. Daycare is not classified as construction, so the standard threshold applies.
Cost to Start a Daycare in Missouri
| Item | Cost | Notes |
|---|---|---|
| Child Care License | Free | No application or licensing fee |
| FBI Fingerprint Check (per person) | $41.75 | Via MACHS portal |
| Family Care Safety Registry (per person) | $15.55 | One-time lifetime registration |
| CPR/First Aid Certification (per person) | $50-$100 | Must include in-person skills assessment |
| Annual Training (12 hours/person) | $50-$200 | DESE-approved providers |
| Fire Safety Inspection | Free | State-funded |
| Sanitation Inspection | Free | Local health department |
| LLC Formation | $50 | Secretary of State (online) |
| Federal EIN | Free | IRS, immediate online |
| General liability insurance | $1,500-$3,000/year | Required for licensed facilities |
| Facility setup (toys, furniture, safety equipment) | $2,000-$10,000+ | Varies by capacity |
| Workers’ comp (if 5+ employees) | Varies | Required at 5+ employees |
Estimated total startup cost:
- Family child care home (solo): $2,000-$5,000 (minimal facility prep, lower insurance)
- Child care center (21+ capacity): $10,000-$30,000+ (facility build-out, multiple staff background checks, equipment)
Related Missouri Business Guides
- How to Start a Cleaning Service in Missouri
- How to Start a Food Truck in Missouri
- How to Start an HVAC Business in Missouri
- How to Start a Hair Salon in Missouri
- How to Start a Landscaping Business in Missouri
- How to Start a Private Investigation Business in Missouri
← Back to all Missouri business guides
Frequently Asked Questions
How much does a daycare license cost in Missouri?
Missouri charges no application fee and no licensing fee for child care facilities. The license is completely free. Your main costs are background checks ($57 per person for FBI fingerprints + FCSR), CPR/First Aid certification ($50-$100), and liability insurance ($1,500-$3,000/year).
What are the staff-to-child ratios in Missouri?
Missouri requires 1:4 for infants (6 weeks-12 months), 1:8 for toddlers (13-24 months) and two-year-olds, 1:10 for three and four-year-olds, and 1:16 for children five and older. These ratios apply to child care centers. Family child care homes have specific capacity limits based on the number and ages of children.
What background checks are required for daycare staff in Missouri?
All child care workers must complete two checks: FBI fingerprint background check ($41.75 via MACHS portal) and Family Care Safety Registry registration ($15.55, lifetime). FCSR screening must be repeated annually. Both must be completed before staff have contact with children.
How many children can I care for in a home daycare in Missouri?
A family child care home allows up to 10 children. A solo provider can care for up to 6 children (max 3 under age 2). With an assistant, capacity increases to 10 children (max 4 under age 2), or 8 if all children are under age 2.
What training do I need to start a daycare in Missouri?
You need CCDF Health & Safety Training (within 90 days of hire), Pediatric CPR/First Aid certification with in-person skills assessment, and 12 hours of DESE-approved training per calendar year. Center directors must meet education requirements based on capacity level.
Are there any daycare regulation changes coming in Missouri?
Yes. Missouri reviewed over 1,400 child care licensing requirements and identified 177 rules to eliminate (79 for family homes, 98 for centers). Full implementation is expected in late 2026 or early 2027. These changes are designed to reduce regulatory burden while maintaining child safety standards.
More Missouri Business Guides
- How to Start a Cleaning Service in Missouri (2026)
- How to Start a Food Truck in Missouri (2026)
- How to Start a Hair Salon in Missouri (2026)
- How to Start a Landscaping Business in Missouri (2026)
- How to Start a Private Investigation Business in Missouri (2026)
- How to Start an HVAC Business in Missouri (2026)
Start a Daycare Business in Other States
- Alabama
- Alaska
- Arizona
- Arkansas
- California
- Colorado
- Connecticut
- Washington D.C.
- Delaware
- Florida
- Georgia
- Hawaii
- Idaho
- Illinois
- Indiana
- Iowa
- Kansas
- Kentucky
- Louisiana
- Maine
- Maryland
- Massachusetts
- Michigan
- Minnesota
- Mississippi
- Montana
- Nebraska
- Nevada
- New Hampshire
- New Jersey
- New Mexico
- New York
- North Carolina
- North Dakota
- Ohio
- Oklahoma
- Oregon
- Pennsylvania
- Rhode Island
- South Carolina
- South Dakota
- Tennessee
- Texas
- Utah
- Vermont
- Virginia
- Washington
- West Virginia
- Wisconsin
- Wyoming