By StartBusinessByStatePublisher: Robert SmithResearch process
Last updated:
Considering an LLC? $125 on Sunbiz. File a Florida LLC →
Starting a daycare in Florida means navigating rules written specifically for Florida – your licensing path depends on which Florida county you operate in, facilities follow Florida Administrative Code Chapter 65C-22, while family homes follow Chapter 65C-20, your staff-to-child ratios come from Florida Statute 402.305(4), and your background screenings run through the DCF Clearinghouse under F.S. 435. The agency is the Department of Children and Families (DCF) – not DBPR; some local child-care programs are administered by county health departments. Four Florida counties (Broward, Palm Beach, Pinellas and Sarasota) have elected under F.S. 402.306 to administer their own child care licensing, so your application path depends on your location. The other 63 Florida counties (including Miami-Dade, Orange, Duval, and Leon) go through DCF directly via the CARES portal.
Choose your structure; an LLC costs $125
Choose the operator and business structure before applying so names stay consistent across applications and policies. An LLC is optional; Florida charges $125 to form one on Sunbiz. Filing directly and using paid help carry the same state fee, with any provider fee added separately.
$138.75 annual report due May 1
Plan enrollment using your local market, not a statewide shortage assumption. Florida’s net domestic migration was 22,517 in 2025, down from 310,892 in 2022, according to University of Florida’s analysis of Census data. Providers may apply to participate in Voluntary Prekindergarten (VPK) and School Readiness (SR) through their Early Learning Coalition. Those programs have separate eligibility, contracting and quality requirements; participation does not guarantee enrollment or revenue.
Daycare Requirements in Florida at a Glance
| Requirement | Agency / Detail | Cost | Timeline |
|---|---|---|---|
| LLC Articles of Organization | Sunbiz.org | $125 ($100 + $25 RA) | Check Sunbiz’s current processing queue |
| Family child-care home registration or license | DCF or local licensing authority; age-mix capacity rules apply | DCF: $25 registration or $50 license annually; local fees vary | Depends on category, screening, training and local approvals |
| Large family child-care home | DCF or local licensing authority; 8 or 12 children depending on age mix | DCF license $60/year; local fees vary | Two years as a licensed family home, qualifying operator credential held for one year, and required staffing |
| Child-care facility | Generally more than five unrelated children; statutory exclusions and home categories matter | DCF: $1 per licensed child, $25 minimum and $100 maximum annually; local fees vary | Depends on premises, training, screening and completed application |
| Background screening | DCF eligibility review; fingerprint and juvenile-record routes differ | Vendor and required-check charges vary | Complete the applicable clearance process; five-year rescreening and other triggers apply |
| Introductory child-care training | Generally 40 hours for facility personnel; family-home operators have a separate 30-hour route, with additional large-home requirements | Check current approved course and exam fees; exemptions and free coursework may apply | Facility personnel: begin within 90 days; finish within 12 months of starting. Home operators must meet pre-care requirements. |
| Five-hour early literacy training | Approved training or accepted equivalent | Provider-dependent | Facility personnel: within 12 months of employment; home operators: before licensure and care |
| Pediatric CPR / first aid | Meet the current handbook’s certification and on-site staffing requirements | Training-provider fees vary | Keep certificates current and renew before their stated expiration |
| Annual in-service training | Role-specific requirements after introductory training | Provider fees vary | Facility personnel generally need 10 clock hours or one CEU per fiscal year; see handbook exceptions and home rules |
| Fire inspection (center-based) | Local Fire Marshal | Varies | Annual |
| Local business tax, zoning and occupancy | County/city offices; category and exemptions matter | Verify actual applicable local charges | Local review and preparation times vary |
| General liability insurance | Review local licensing, lease, VPK/SR contract and transportation requirements | Obtain a quote for your actual operation; VPK/SR generally specify $100,000/$300,000, with statutory qualifications | Arrange required coverage before the applicable activity or contract begins |
| Workers’ comp (if 4+ employees) | FL-licensed carrier | Varies | General non-construction threshold; employee counting and valid officer/member exemptions matter |
| VPK provider agreement (optional) | Responsible Early Learning Coalition | No tuition or registration charges to parents for the VPK program portion; review provider terms | Apply through the coalition’s current contracting process |
Shopping for coverage? Compare daycare insurance costs and coverage in Florida, including exclusions, state requirements and details to prepare for a quote.
How to Start a Daycare in Florida (Step by Step)
Step 1: Choose Your Child Care Category
Florida’s DCF (and the four local licensing programs) recognize three categories under F.S. 402.302:
- Family child-care home: An occupied residence regularly caring for children from at least two unrelated families for compensation. Registration is available only where a license is not required; a home may also voluntarily obtain a license. DCF charges $25 for registration or $50 for a license annually. Capacity depends on ages, and household children under 13 count: up to four infants; up to six with no more than three infants; six preschool children all older than 12 months; or ten with no more than five preschool children and no more than two infants. See the home handbook.
- Large family child-care home: A licensed residence with at least two full-time child-care personnel during operation, including the owner or occupant. It must first operate as a licensed family home for two consecutive years, and its operator must have held the qualifying credential for one year. Capacity is up to eight children from birth to 24 months, or up to twelve with no more than four under 24 months; household children under 13 count. DCF’s annual license fee is $60.
- Child-care facility: The statutory definition generally covers paid care for more than five children unrelated to the operator, subject to exclusions and distinct home-provider rules. DCF’s annual fee is $1 per licensed child, with a $25 minimum and $100 maximum. Local licensing authorities set their own fees. Review the statutory definitions before choosing a category.
Step 2: Know Which Agency Licenses You
Under F.S. 402.306, four Florida counties have opted to administer their own child care licensing programs with their own local ordinances, inspections, and application processes:
- Broward County – Childcare Licensing and Enforcement Section
- Hillsborough County: DCF’s current handbook places Hillsborough among the 63 DCF-regulated counties; it is no longer in the list of four local licensing programs.
- Palm Beach County – Florida Department of Health in Palm Beach County (administered via FDOH)
- Pinellas County – Pinellas County License Board
- Sarasota County – County Licensing Program
The other 63 Florida counties – including Miami-Dade, Orange (Orlando), Duval (Jacksonville), Leon (Tallahassee), and Lee (Fort Myers) – are licensed directly by DCF through the CARES portal at myflfamilies.com. Local ordinances in county-run counties may impose additional requirements on top of state minimums (for example, Broward’s Code Chapter 7 includes some stricter ratios and training requirements than the state baseline). Always verify whether your county runs its own program before starting the application – the correct authority must review the application.
Step 3: Complete Clearinghouse Background Screening
Screen people according to their role and the current handbook. Required checks include state and national criminal records, sex-offender registries, and applicable out-of-state child-abuse and neglect history. Adult fingerprint submissions use a compatible Livescan vendor and the DCF Clearinghouse. Household members aged 12–17 follow the juvenile-record-check route rather than adult fingerprinting. Volunteer and supervised-student exceptions are limited; confirm eligibility before assigning duties.
- Cost: Obtain current Livescan and other required-check prices; there is no single all-in screening price for every applicant.
- Rescreening: Generally every five years; a qualifying break in employment and other circumstances can require additional screening.
- Disqualifying history: DCF applies the applicable child-care screening and exemption rules. Some offenses prohibit an exemption, while others may permit an exemption application; an arrest, conviction, eligibility determination and exemption are not interchangeable. Do not decide eligibility yourself from an informal list.
- No unsupervised access before clearance: Do not let any staff work unsupervised with children until their Clearinghouse result posts. DCF can issue a provisional-hire status in specified circumstances, with direct supervision by screened and trained staff; it is not permission for unsupervised access.
Step 4: Complete Training Requirements
Training requirements differ between facilities, home operators, substitutes and large-home staff. Complete the requirements that apply before the relevant deadline.
- Introductory training: Facility personnel generally complete 40 hours and competency examinations, subject to educational and historical exemptions. Begin within 90 days of employment and finish within 12 months after training begins, not necessarily within one year of hire. Family-home operators follow a 30-hour home-specific route before licensure and care; large-home operators have additional requirements. Check facility training rules and home-provider training rules for your role and current costs.
- Early literacy: Complete five approved clock hours or an accepted equivalent. Facility personnel must do so within 12 months of employment. Home operators must meet the requirement before licensure and caring for children.
- Pediatric CPR and first aid: Use training accepted by the current handbook, including its practical skills component, and maintain valid certificates. Schedule enough appropriately certified staff to meet the facility’s on-site requirements throughout care and activities. Home operators and substitutes have their own pre-care requirements. Renewal follows the certificate and applicable rules; do not assume every certificate lasts exactly two years.
- Director credential: A facility must document an active Florida Director Credential before licensing. A staff credential or FCCPC alone is not automatically a Director Credential. Follow the separate director application, experience, education and renewal requirements in the handbook.
- 10-hour annual in-service training – After completing the required introductory training, facility personnel complete at least 10 clock hours or one CEU each state fiscal year, July 1–June 30. Home-provider requirements are described separately in the home handbook.
Step 5: Meet Facility Requirements (F.A.C. 65C-22)
Florida Administrative Code Rule 65C-22 sets physical standards for licensed child care facilities:
- Indoor space: Generally 35 square feet of usable floor space per child for facilities not licensed on October 1, 1992. The 20-square-foot grandfather provision depends on continuous licensing at the original site, not simply the age of a building. Room-specific and excluded-space rules also apply.
- Outdoor play area: Generally 45 square feet per child age one or older using the space, with room for at least half the licensed capacity. Do not put more children outside at once than the area permits. Specific urban, indoor-recreational and evening-care alternatives exist. Check fencing, shade and equipment-safety requirements.
- Bathrooms: Generally one toilet and sink for the first 15 children, plus one of each for every additional 30 children. A diapered-infants-only facility has a separate one-toilet/two-sinks-per-30 rule. Building and local requirements must also be met.
- Safe sleep: Use compliant cribs or play yards, fitted sheets and firm sleeping surfaces; keep prohibited loose bedding and other hazards out. Follow the handbook’s infant back-sleeping and physician-exception rules and federal crib/play-yard standards in 16 CFR parts 1219–1221.
- Secure storage: All cleaning supplies, medications, hazardous chemicals locked or out of reach.
- Fire drills: Monthly fire drills required. Document date, time, children present, evacuation time. Keep the required drill records available for inspection.
- Infant space: Provide the required safe sleeping and open play space, and plan the room arrangement with the licensing authority. A blanket separate-infant-room rule is not a substitute for the handbook’s space, supervision and age-group requirements.
Step 6: Apply for Your License
If you operate in DCF-licensed counties (63 of 67): Submit via the CARES (Child Care Administration, Regulation and Enforcement System) portal at myflfamilies.com. Include: application form, Clearinghouse clearance letters, training certificates, fire inspection (center-based), floor plan, any required proof of insurance, zoning approval, Certificate of Occupancy (center-based).
If you operate in a county-run county (Broward, Palm Beach, Pinellas, Sarasota): apply through that county’s licensing program – not DCF. Documents are similar but the process, inspector assignment, and local ordinance review differ.
Timeline: Allow time for the premises, required training, screening, local approvals and a complete application. The regulator’s review of a complete application is different from the time needed to prepare the business. Ask your licensing authority about its current queue; your opening date depends on completing all applicable steps.
Step 7: Local Business Tax Receipt, Zoning, Certificate of Occupancy
Check the county and city business-tax ordinances, exemptions, zoning and occupancy rules for your location before committing to premises. Fees and prerequisite approvals vary. A commercial facility may need building, fire and occupancy approvals; home-provider zoning protections and restrictions differ from those for commercial centers.
Home-based operators: Many counties restrict home occupations (parking limits, signage restrictions, drop-off/pick-up traffic caps). Family day care is often granted broader latitude than commercial home businesses, but verify with your county zoning office before signing a lease or starting renovations.
Step 8: Get Insurance
Match insurance to the actual requirement. The $100,000-per-occurrence/$300,000-aggregate limits are specified for VPK and School Readiness provider arrangements, with statutory qualifications; they are not a universal DCF licensing minimum for every daycare. Check local licensing, lease, program-contract and vehicle requirements. See VPK provider requirements and School Readiness provider requirements.
- Home-based FDCH/LFCCH: $400-$1,500/year for a dedicated child care liability policy. Do not assume standard homeowners insurance covers child care operations. Florida law is explicit: a residential property policy does not cover liability claims arising from the operation of a family child care home or large family child care home, and the insurer has no duty to defend such a claim, unless the policy specifically covers it or carries a business rider or endorsement (Fla. Stat. §627.70161(3)). The same statute protects you in one respect: an insurer may not deny, cancel, or refuse to renew your residential policy solely because you operate one, though it may act for other lawful reasons, including exceeding your authorized capacity.
- Center-based CCF: $1,100-$4,000/year depending on capacity and location.
- Workers’ compensation: Florida’s non-construction threshold generally starts at four employees, full- or part-time. Corporate officers and LLC members count unless a valid exemption applies. Eligible non-construction officers/members can apply for an exemption without the construction exemption’s $50 statutory charge; certificates generally last two years. Check employee counting and non-construction exemption eligibility.
Compare daycare insurance in Florida before you request a quote.
Get a daycare insurance quote
Start your daycare insurance quote with Simply Business. Answer a few questions about your business and let their team help you find coverage.
Affiliate link — we may earn a commission at no additional cost to you.
Step 9: Consider VPK and School Readiness Provider Status
Voluntary Prekindergarten (VPK): Florida’s state-funded, free-to-parents preschool program for every Florida 4-year-old (born on or before September 1). Providers apply to their county’s Early Learning Coalition for VPK contract status. Confirm each child’s current statutory eligibility; qualifying families may defer enrollment to a later year. You receive per-child reimbursement at the state VPK rate for school-year or summer programs. Parents cannot be charged registration or tuition for the VPK portion, but can pay for extended-day/wrap-around care. VPK providers must meet additional quality standards (director credentials, curriculum approval).
School Readiness: Eligible providers contract with their Early Learning Coalition to serve qualifying families. Gold Seal is a separate designation with approved accreditation and compliance conditions. A participating Gold Seal provider receives a minimum 20% rate differential for each enrolled SR child by care level and unit of care under section 1002.945; accreditation alone does not guarantee a 15–30% increase or an SR contract.
Evaluate VPK and SR reimbursement, attendance rules, staffing costs and contract timing alongside private-pay tuition. Ask your coalition when it accepts provider applications. Approval, family eligibility and enrollment all affect revenue; do not build a budget assuming that program participation fills the first year’s places.
Florida Staff-to-Child Ratios (F.S. 402.305(4))
Plan staffing for the applicable ratios throughout care, including trips and transitions. Follow the handbook’s additional supervision rules. During permitted nap-time arrangements for older children, other required ratio staff must remain available in the building on the same floor; children up to 24 months need direct supervision.
| Age Group | Staff-to-Child Ratio |
|---|---|
| Birth to 1 year | 1:4 |
| 1 year to under 2 years | 1:6 |
| 2 years to under 3 years | 1:11 |
| 3 years to under 4 years | 1:15 |
| 4 years to under 5 years | 1:20 |
| 5 years and older | 1:25 |
Mixed-age facility groups: If a child under one is included, use 1:4; if children age one but under two are included, use 1:6. For a group composed entirely of children age two or older, the statutory ratio follows the age group with the largest number of children. Home-provider capacity rules are separate. Local licensing standards may be stricter. See section 402.305(4).
Florida Child Care Tax and Compliance Notes
Child-care receipts and sales tax: Ordinary child-care service receipts are generally outside Florida’s enumerated taxable services. This does not exempt every transaction made by a provider: review retail sales, taxable admissions or other separate activities, and sales/use tax on purchases. Do not use a broad “service charge” label to decide taxability. Check the statutory taxable categories and DOR guidance for your actual activities.
Health and immunization records: Follow the handbook’s documentation rules, including DH 680 or an applicable exemption form. For facilities, required records generally must be supplied within 30 days of enrollment, with specified exceptions and conditions; follow the documented enrollment conditions and deadlines. School-age records already held by the child’s school and documented medical or religious exemptions require separate treatment.
Food service. If you serve meals to enrolled children, you may qualify for the Child and Adult Care Food Program (CACFP) administered in Florida by the Department of Health. Approved participating providers can receive reimbursement for eligible meals and snacks under the program’s nutrition, participation, recordkeeping and claim rules; a child-care license alone does not establish reimbursement eligibility.
Florida Daycare Market: What to Research
Use these Florida-specific research questions to test local demand; they are not evidence that a particular area has a shortage:
Suburban growth: Compare local child population, licensed capacity, ages served, opening hours and current provider waitlists in the county you plan to serve. Statewide growth does not establish routine waitlists of 50–200 children or prove that every infant program will fill.
Language needs: Ask local families and referral organizations about the languages they need and check existing providers. Bilingual staffing can be relevant to your service design, and current family interviews can help test whether it would meet an unmet need.
Military families: If serving families near a military installation, verify the relevant fee-assistance program’s provider qualifications, payment terms and local need before budgeting for those enrollments. Proximity to a base does not guarantee full enrollment.
Household patterns: Research the number and needs of local families with young children directly. Florida’s older population share does not by itself establish higher child-care demand around retirement communities.
Cost to Start a Daycare in Florida
Illustrative planning allowances, not surveyed prices: The private-service and equipment ranges below are budgeting examples, not verified market averages or quotes. Replace them with current local quotes. State fees apply only to the named category; do not automatically add an LLC, DBA or every optional item. Working capital, staffing and location-specific costs can take a project beyond the example totals.
Review Florida childcare wages and $15-floor payroll scenarios when updating staffing costs for September 30, 2026. Model your actual staff schedule; the wage study does not change required staffing ratios.
Home-Based Family Child Care (capacity depends on age mix)
| Item | Cost | Notes |
|---|---|---|
| Optional LLC formation plus DBA if needed | $125 LLC + $50 DBA when required | One-time |
| DCF home registration or license | $25 registration or $50 license/year; local fees differ | Annual |
| Clearinghouse Level 2 screening | $70-$100/person | Applicable adult checks; household ages 12–17 have a separate juvenile-check route |
| Home-operator 30-hour training + five-hour literacy + applicable exams | $140-$240 | Home operators: complete required pre-care training first |
| Pediatric CPR/First Aid | $40-$80 | Pediatric-specific required |
| County Local Business Tax Receipt | $25-$150 | Annual |
| General liability insurance | $400-$1,500/year | Check applicable local and VPK/SR contract limits |
| Facility prep (childproofing, supplies, safe-sleep, playground fence) | $1,500-$10,000 | Varies widely |
| Marketing, website, signage | $200-$1,000 | Optional at start |
| Illustrative launch envelope: $3,000–$15,000; not the sum of every row | ||
Center-Based Child Care Facility (25-75 Children)
| Item | Cost | Notes |
|---|---|---|
| Optional LLC plus DBA if needed; IRS EIN is free | $125 LLC + $50 DBA when required | One-time |
| DCF Child Care Facility license | $25-$100/year | $1/child |
| Clearinghouse screening (5-10+ staff) | $350-$1,000+ | All staff + director |
| 40-hour training + literacy + exams (all staff) | $700-$2,400+ | Per staff member |
| Director Credential (separate from a staff credential) | $500-$2,000 | Training/credential costs vary; director credentials have renewal requirements |
| Pediatric CPR/First Aid (all staff) | $200-$800 | Per staff member |
| Local Business Tax Receipt + zoning + C of O | $150-$1,000+ | Varies by county |
| General liability insurance | $1,100-$4,000/year | Check applicable local and VPK/SR contract limits |
| Workers’ comp insurance | Varies | Required at 4+ employees |
| Lease deposit + build-out | $5,000-$40,000+ | Tenant improvements, bathrooms, handwash sinks |
| Furniture, equipment, supplies | $5,000-$25,000 | Cribs, tables, shelves, smart boards |
| Outdoor play area (fencing, surfacing, equipment) | $3,000-$15,000 | Facility capacity/age and applicable outdoor-space rules; see exceptions above |
| Marketing, website, enrollment software | $500-$3,000 | Waitlist management, billing |
| Illustrative launch envelope: $20,000–$100,000+; not the sum of every row | ||
Need a loan to cover these startup costs? See Florida business loans for new and growing businesses for microlenders, state programs and SBA offices.
Related Florida Business Guides
← Back to all Florida business guides
Data for Florida
Free research and planning tools for starting a daycare in Florida. Most of the data pages compare every state, so look for Florida in the table or map.
- Family income vs. daycare costs: how much of a family budget infant care takes in Florida.
- Childcare zoning laws: recent state zoning changes that affect where a daycare can open.
- How childcare subsidy rates are set: which states explain their subsidy rates, and bills that would change that.
- Daycare tuition cash flow calculator: see how weekly or monthly tuition and late payments affect your cash.
- Daycare break-even calculator: how many enrolled children you need to cover costs and pay yourself.
Start a Daycare in Nearby States
Thinking about opening a location across the state line, or just want to see how Florida stacks up? Here are the same step-by-step guides for the states around Florida, plus a few that other new daycare owners read most.
- Starting a daycare in Alabama (borders Florida)
- Starting a daycare in Georgia (borders Florida)
- Starting a daycare in South Carolina (near Florida)
- Starting a daycare in Tennessee (near Florida)
- Starting a daycare in North Carolina (near Florida)
- Starting a daycare in Pennsylvania (one of our most-read daycare guides)
- Starting a daycare in Ohio (one of our most-read daycare guides)
- Starting a daycare in Massachusetts (one of our most-read daycare guides)
Frequently Asked Questions
What license do I need to open a daycare in Florida?
Start by identifying the correct category under section 402.302 and whether DCF or a local authority regulates it. Home registration and licensing are different: DCF charges $25 for registration, $50 for a family-home license and $60 for a large-home license. A DCF facility license costs $1 per licensed child, $25–$100 annually. Broward, Palm Beach, Pinellas and Sarasota have local licensing programs; DCF regulates the other 63 counties. Local fees and standards may differ.
What are Florida’s daycare staff-to-child ratios?
For facilities, the basic ratios are 1:4 for infants under one, 1:6 for age one, 1:11 for age two, 1:15 for age three, 1:20 for age four and 1:25 for age five or older. Mixed groups containing under-twos use the relevant infant/toddler rule; when all children are at least two, use the age group with the largest number of children. Home-provider capacity and stricter local requirements are separate.
Do I need a background check to run a daycare in Florida?
Yes, apply the screening rules for each role. Required adult checks and Clearinghouse fingerprint submissions differ from the juvenile-record checks for household members aged 12–17. Limited volunteer and supervised-student exceptions exist. Follow DCF eligibility and supervision rules, five-year rescreening and any additional screening triggers; get current vendor fees rather than assuming one statewide price.
Is daycare taxable in Florida?
Ordinary child-care service receipts are generally not subject to Florida sales tax. Separate retail sales or other taxable activities can create registration and collection duties, and purchases may carry sales or use tax. Classify each actual activity rather than assuming everything a daycare charges is exempt.
How much does it cost to start a daycare in Florida?
A home-based family day care can be modeled with an illustrative budget of $3,000-$15,000 including LLC formation, Clearinghouse screening, training, insurance, and facility prep. A center-based Child Care Facility (25-75 children) has an illustrative planning range of $20,000-$100,000+ once you add lease/build-out, commercial equipment, playground, multiple staff, and marketing.
How long does it take to get a daycare license in Florida?
There is no verified universal opening timetable. Premises approvals, training, screening and the completeness of the application affect the time needed. Ask the responsible licensing authority about its current process and separate preparation time from its review of a complete application.
Comparing states? See our daycare guides for all 50 states.
More Florida Business Guides
- Do You Need an Arborist License in Florida?
- Florida Business Loans: Compare Funding Options
- Florida LLC Cost: $125 to File on Sunbiz (2026)
- How to Get a Dealer License in Florida: Cost & Requirements
- How to Get a Florida Liquor License
- How to Get a Florida Massage License
- How to Get a Real Estate License in Florida: Cost & Steps
- How to Start a Cleaning Service in Florida (2026)
- How to Start a Food Truck in Florida (2026)
- How to Start a Hair Salon in Florida (2026)
- How to Start a Landscaping Business in Florida (2026)
- How to Start a Plumbing Business in Florida: Licenses, Costs & Insurance
- How to Start a Private Investigation Business in Florida (2026)
- How to Start an Electrical Business in Florida: Licenses, Costs & Insurance
- How to Start an HVAC Business in Florida (2026)